Reducing Construction Costs

Iconic Bridge Project Connecting Hong Kong to Zhuhai and Macau Adopts BIM Methodology, Reducing Construction Costs by 12%

The Leighton-Chun Wo joint venture standardized on a BIM methodology to drive consistency on this large multi-discipline design project that will connect Hong Kong, Macau, and Zhuhai. This revolutionary project includes 50 kilometers of bridges and tunnels and will create a distinctive entry point to Hong Kong. Leighton Asia conducted the civil, electrical, mechanical, structural, subsurface, and building work as the lead contractor for this ambitious project.